See how it works.

One loop from inspection to intelligence: a live register, a self-updating forecast, one-click reports, and work orders that feed the engine.

01 · Asset Register

Every component. Verified, valued, alive.

Room-by-room inspection data becomes a living register: condition, install date, remaining life and replacement cost for every component, with photo evidence behind each row.

app.assetcycle.com.au · Asset register

Asset register

Building 12 · Elm Street, Parramatta · 214 components

filter_listCondition: AlladdAdd component

Total components

214

Replacement value

$2.8M

Due within 2 years

18

Evidence coverage

100%

ComponentConditionInstalledRemaining lifeReplacement
Hot water systemPoor20149 mo$6,500
Roof membraneFair20114.5 yr$48,000
Kitchen cabinetry · Unit 4Fair20166 yr$12,400
LiftGood201912 yr$180,000
Fire detection systemGood20218 yr$34,000

02 · Lifecycle Forecast

Ten years of capital works, recalculated daily.

The engine projects condition, remaining life and spend for every component, and reruns the numbers every time a work order closes.

app.assetcycle.com.au · Lifecycle forecast

Component lifecycle: Hot water system · Bldg 12

Installed 2014 · Rheem 315L · serviced 6 times

auto_awesomeLearned from 132 similar units

Current condition

Poor

Remaining life

9 mo

Replace vs repair

Repair

Budgeted FY27

$6,500

Projected condition over 10 years

With planned repairDo nothing
Repair · FY27
FY27FY29FY31FY33FY36

03 · Report Generation

Board-ready reports in one click.

AI drafts capital plans, condition summaries and compliance evidence packs straight from live data, every number with a trail behind it.

app.assetcycle.com.au · Reports

Generate report

Drafted from live data · sources cited on every figure

auto_awesomeGenerate with AI
request_quote

10-year capital plan

Board pack with spend by year, building and component class.

home_health

Condition summary

Portfolio health with photo evidence per component.

verified_user

Compliance evidence pack

NRSCH / Aged Care Standards audit trail, one click.

Preview: Executive summary

Drafting…

Across the 96-building portfolio, projected capital expenditure for FY27 is $4.2M, concentrated in hot water systems ($0.6M) and roof membranes ($1.1M). Hot water replacement budgets were revised upward 12% after closures showed earlier-than-spec failures…

link1,284 sources linkedExport PDFExport Excel

04 · Raise Work Order

From defect to dispatched in seconds.

Raise a work order from any component, pre-filled with condition, photos and budget. When it closes, the forecast recalculates itself.

app.assetcycle.com.au · Work orders

New work order

ComponentHot water system · Bldg 12, Unit 7
Work typeRepair: valve replacementexpand_more
PriorityHigh
Budget (suggested)$1,850
sendRaise & assign contractor

auto_awesomePhotos, condition history and warranty attached automatically

Open work orders

WO-2847 · Roof leak, Bldg 4Apex Roofing · due FriIn progress
WO-2846 · Smoke alarm, Unit 11FireSafe Co · due WedScheduled
WO-2841 · HWS valve, Unit 7HydroFix · closed todayClosed
auto_awesome

WO-2841 closed. Forecast recalculated across 132 similar units.

05 · Manage Contractors

The right contractor, compliant and on time.

Licences, insurance and performance in one place. Assign work to whoever actually delivers, and see it in the numbers.

app.assetcycle.com.au · Contractors

Contractors

28 active · 2 compliance actions required

person_addInvite contractor
ContractorTradeComplianceOn-time rateJobs YTD
HFHydroFix PlumbingPlumbingVerified98%64
ARApex RoofingRoofingVerified94%31
FSFireSafe CoFire servicesInsurance due91%47
VEVolt ElectricalElectricalLicence expired76%12
blockVolt Electrical auto-suspended from new work ordersnotificationsFireSafe Co reminded: insurance expires in 14 days

See it with your own buildings.

15 minutes, live data, no slideware.

See AssetCycle in action

Schedule a 15-minute product demo with an expert.